EasyManua.ls Logo

Spaceman 6210 - Frozen Product Operation and Adjustment; Adding Mix to the Machine

Spaceman 6210
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
FROZEN PRODUCT OPERATION
ADD PRODUCT TO MACHINE
Verify machine has been recently
sanitized (within 1 hour); if machine has
not been recently sanitized, verify door
hand-screws are tight, and perform
sanitizing steps (Page 15)
Place bucket or large container
below draw valve
Thoroughly mix and prepare at
least 2 gallons of product
according to manufacturer
instructions; mix should be cool
and smooth (free of large chunks)
1 2 3
Spaceman USA 6210 Training rev111918

Related product manuals