EasyManua.ls Logo

SPALDING SPA0350 - Page 24

SPALDING SPA0350
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assemble the Goal
24
G
ASSEMBLE THE GOAL
13. Support system on sawhorse and extend system to highest position.
14. Stretch counterbalance spring (44) to upper elevator tubes and secure with with bolt (43) and nut
(40) in location shown.
#43
#40
#44
WARNING
USE EYE PROTECTION WHEN INSTALLING SPRINGS.

Related product manuals