Preparing to Pump
Prior to pumping, make sure your pumping kit has been sterilised. Refer to
the Sterilising Breast Pump Parts section of this manual (page 13) for
information on proper sterilization of parts.
Wash your hands thoroughly in warm soapy water prior to handling parts
that come in contact with the breast or breast milk.
Inspect parts for damage. Do not use parts if they are damaged. Do not use
silicone parts such as membranes or duck valves if they are torn. To maintain
suction and overall functionality of the pump, silicone parts need to be
replaced regularly. Replacement parts are available on www.Spectra-
Baby.com.au; contact us if you need assistance.
Charging your S1
The S1 can operate on battery power or while plugged in and charging. To
charge your S1, connect the power adaptor to the port on the back of the
pump. Then, connect the adaptor into the power mains (for information on
assembling your power adaptor, see Adaptor Assembly on page #). The
S1 should be fully charged after 4 hours and should operate for 3 hours
on a fully charged battery.