EasyManua.ls Logo

Spectra T950 - Page 24

Spectra T950
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2—Site Requirements Physical Requirements
February 2019 Site Preparation GuideSpectra T950B Library
24
Floor and Ceiling Cable Access
Figure 8 and Figure 9 on page 24 provide the dimensions for cable access
holes for main and drive expansion frames. See Figure 11 on page 30 to see
the location of these access holes in a frame. The dimensions are different
for the floor and ceiling access holes. Be sure to consider the structural
integrity of the floor before cutting holes in the floor for access.
WARNING
Library frames are very heavy (see product specifications for details). Use extreme
caution and proper equipment when moving these, and ensure that your floor has
adequate structural integrity.
Figure 8 Ceiling cable access for main and drive expansion
frames.
Figure 9 Floor cable access for main and drive expansion
frames.
5.75 in.
(14.6 cm)
5.75 in.
(14.6 cm)
5.75 in.
(14.6 cm)
1.875 in. (4.8 cm)
1.3 in.
3.25 in.
4.0 in.
(8.3 cm)
(3.3 cm)
(10.1 cm)
1.875 in. (4.8 cm)
29 in. (73.7 cm)
6.0 in.
(15.2 cm)
6.0 in.
(15.2 cm)
6.0 in.
(15.2 cm)
1.25 in. (3.2 cm)
1.3 in.
3.5 in.
4.25 in.
(8.9 cm)
29 in. (73.7 cm)
(3.3 cm)
(10.8 cm)
1.25 in. (3.2 cm)

Other manuals for Spectra T950

Related product manuals