Chapter 2—Site Requirements Network Cabling Requirements
February 2019 Site Preparation Guide—Spectra T950B Library
30
NETWORK CABLING REQUIREMENTS
The library can accommodate cabling from either the bottom or the top of
the library. See Floor and Ceiling Cable Access on page 24 for additional
information.
Use Figure 11 and the descriptions that follow to plan network
connectivity for the library installation.
Figure 11 Locations for network cable connections.
Library Control
Module (LCM)
Fibre Channel
Ethernet ports
Robotics Interface
Module (RIM)
Fibre Channel
connectors (2)
LTO-5 or LTO-6 Drive
Fibre Channel
connectors (2)
LTO-4 Drive
BlueScale Vision
camera Ethernet port
Cable access cutouts
Cable access cutouts
Fibre Channel
connectors (2)
TS11x0 Technology
ports
RIM RIM2
Drive