EasyManua.ls Logo

Spectra T950 - Bulk TAP Media Expansion Frame Components

Spectra T950
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3—Preparing for Installation Moving the Library After Installation
February 2019 Site Preparation GuideSpectra T950B Library
38
MOVING THE LIBRARY AFTER INSTALLATION
The library hardware is configured to ensure proper thermal control, air
flow, and dust filtering. After the library is installed, do not move the
library.
Contact Spectra Logic Technical Support before making any changes to
your library hardware or performing any service operations.
Important
Moving the library without assistance from a Spectra Certified field engineer will
void your service contract. Contact Spectra Logic Professional Services for
assistance if you need to relocate your library (see Contacting Spectra Logic on
page 8).

Other manuals for Spectra T950

Related product manuals