Chapter 3—Preparing for Installation Moving the Library After Installation
February 2019 Site Preparation Guide—Spectra T950B Library
38
MOVING THE LIBRARY AFTER INSTALLATION
The library hardware is configured to ensure proper thermal control, air
flow, and dust filtering. After the library is installed, do not move the
library.
Contact Spectra Logic Technical Support before making any changes to
your library hardware or performing any service operations.
Moving the library without assistance from a Spectra Certified field engineer will
void your service contract. Contact Spectra Logic Professional Services for
assistance if you need to relocate your library (see Contacting Spectra Logic on
page 8).