EasyManua.ls Logo

Spectra T950 - Page 34

Spectra T950
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34
CHAPTER 3
Preparing for Installation
The library will be installed by a certified Spectra Logic field engineer. This
chapter outlines the requirements for storing and moving the library and
its components. Make sure that you review these requirements carefully.
The information is provided to ensure that the installation site meets the
necessary requirements before the Spectra Logic field representative arrives.
Topi c
Receiving and Storing the Library page 35
Unpacking and Moving the Library page 36
Moving the Library After Installation page 38
WARNING
Library frames are very heavy (see product specifications for details). Use extreme
caution and proper equipment when moving these, and ensure that your floor has
adequate structural integrity.
WARNING
Boxed and unboxed library components weigh from 200 to 400 pounds each (91 to
181 kg) or more. Use extreme caution and proper equipment when moving these.
WARNING
The ties around the shipping crates are secured very tightly; the tension may cause
them to whip outward when cut. Use care when cutting the ties so that you will not
be hit.

Other manuals for Spectra T950

Related product manuals