Hardware Installation and Maintenance Manual 2–1
2 - INSTALLATION
This chapter describes the processes used to mount and install your SS2100.
Once the system arrives, you should take a few minutes to examine the
contents before installing the unit.
What Should be Included in the Shipping Box
The contents of the crates should include:
• The SpectraSensors SS2100 with SCS
• A document CD, which includes this manual and other system
manuals and documents
• One external serial cable
• Additional accessories or options as ordered
If any of these contents are missing, contact your sales representative.
Inspecting the Analyzer and SCS
Remove top and sides of crate and carefully inspect all enclosures for dents,
dings or general damage. Inspect the supply and return connections for
damage. Report any damage to the carrier.
Each analyzer is configured with various accessories and options. If there is any
discrepancy in your order, please contact “Customer Service” on page B-25.
Installing the Analyzer
Installing the analyzer is relatively easy requiring only a few steps that, when
carefully followed, will ensure proper mounting and connection. The steps are
outlined in the following sections:
• Hardware and Tools for Installation
• Mounting the Analyzer
• Connecting Electrical Power to the Analyzer
• Connecting the Output Signals and Alarms
• Connecting the Gas Lines
The safety of the analyzer is the responsibility of the installer and
the organization he/she represents.
Avoid jolting the instrument by dropping it or banging it against a
hard surface which may disturb the optical alignment.