Installation
Hardware Installation and Maintenance Manual 2
–3
Lifting/carrying the analyzer
Due to the analyzer’s size and weight (configurations can weigh 200-300 lbs.,
or 90-130 Kg.), SpectraSensors recommends the use of a forklift, pallet jack,
etc. to lift and/or move the analyzer. If the analyzer is to be lifted by hand,
designate multiple individuals and distribute the weight among personnel to
avoid injury.
Before removing from the crate, move the analyzer as close as possible to the
final installation location. Never lift the analyzer by the electronics enclosure.
Always carry the load using one of the following points/methods (refer to
Figure 2–1):
• Mounting points on Unistrut frame
• Cross members on Unistrut frame
• Support beneath instrument (best used when employing a forklift)
Ensure all equipment used for lifting/moving the analyzer is rated
for the weight load.
Figure 2–1 Lifting points for the
SS2100 H
2
S analyzer
MOUNTING
POINTS (both
BASE SUPPORT
MOUNTING POINT
(both sides)
CROSS MEMBERS