3 Installation of the HV Unit
3.1 Mechanical Installation
The EBM30N/TEG unit must be fitted in the end product and secured in position with screws.
The unit should only be used in a Pollution Degree 2 Installation Category II environment.
The unit is intended for use as a component and no surface of the unit should be accessible in the end
product.
The mechanical outline of the unit is shown in Appendix 1 – EBM30N/TEG Outline Drawing.
The EBM30N/TEG must be fitted in a unit and secured in position using the mounting brackets provided.
A safety interlock should be used to prevent access to the unit when it is operating.
The unit should only be used in a Pollution Degree 2 Installation Category II environment.
Weight: 7.5 Kg
3.2 Electrical Installation
Input Rating: The EBM30N/TEG is designed for operation from a UL recognised, double insulated or
SELV 24Vdc (5%) supply, the maximum continuous current requirement is 2.5A.
3.3 Connecting the Power Supply
The input and output connectors are not intended for field connections and should only be connected to
internal wiring in the end use equipment.
The unit is not supplied with cables for power and communications, for installation of the unit into a given
system all cabling must be prepared to suit the respective interfaces.
A low voltage connectors accessory kit, HV Out and Scintillator mating cables are available for order,
see following sections for details.
The power, control and HV connections to the unit are detailed in the following sections of this manual.
3.3.1. Input Power Connector - PL1