USA and Canada 800.683.2378, International 904.641.1666 Econ FP
CLEANING THE POINT OF INJECTION continued
1. Turn metering pump off and unplug cord. Disable water pump or auxiliary equipment
electrical supply.
2. Depressurize system and bleed pressure from pump discharge line.
3. Loosen and remove connecting nut and ferrule from the duckbill check valve to
disconnect discharge tubing:
Unscrew the top fitting (check valve body) to disassemble. The bottom fitting
(injection fitting with arrow) should remain attached to the pipe.
Remove duckbill from check valve body and replace if deteriorated or swollen
(replace duckbill with every tube change). If clogged, clean or replace (yearly
replacement recommended).
Examine O-ring in the injection fitting and replace if deteriorated or damaged.
4. Insert a #2 Phillips head screwdriver through injection fitting into the pipe to locate
or break up accumulated deposits. If screwdriver cannot be inserted, drill the deposit
out of the injection fitting (DO NOT drill through the opposite pipe wall).
More on next page
Periodic inspection and cleaning of the point
of injection will maintain proper pump
operation and provide maximum tube life.
Replace Duckbill
Clean out accumulated
deposits with a #2 Phillips
head screwdriver.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Stenner Pumps ECON FP Series and is the answer not in the manual?

Stenner Pumps ECON FP Series Specifications

General IconGeneral
BrandStenner Pumps
ModelECON FP Series
CategoryWater Pump
LanguageEnglish

Related product manuals