www.stiebel-eltron.com DCE 11/13| DCE 11/13 RC| DCE 11/13 H | 25
INSTALLATION
Preparations
Pressure-tested, with pressure-tested tap
850
520 - 570
≈ 600
≥ 70
D0000039997
9.1.2 DCE11/13 | DCE11/13RC undersink installation for
washbasin
Non-pressurised, with non-pressurised tap
850
520-570
≈ 600
≥ 70
D0000040000
Pressure-tested, with pressure-tested tap
850
520 - 570
≈ 600
≥ 70
D0000039999
9.1.3 DCE11/13H oversink installation for washbasin
Non-pressurised with non-pressurised tap
Pressure-tested with pressure-tested tap
850
200-300
D0000050407
9.2 Minimum clearances
≥20≥20
≥50
≥50
D0000060938
Maintain the minimum clearances to ensure trouble-free op-
eration of the appliance and facilitate maintenance work.