EasyManua.ls Logo

STIEBEL ELTRON DHE Connect 18/21/24 - Preparations; Installation Location

STIEBEL ELTRON DHE Connect 18/21/24
164 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
  81


9. Preparations
9.1 Installation location
!
Material losses
Install the appliance in a room free from the risk of frost.
Always install the appliance vertically and near the draw-off
point.
The appliance is suitable for undersink and oversink installation.
Undersink installation
D0000056242
1
2
1 Cold water inlet
2 DHW outlet
Oversink installation
D0000057030
12
1 Cold water inlet
2 DHW outlet
Note
Mount the appliance on the wall. The wall must have
sufficient load bearing capacity.

Related product manuals