0478 192 9809 A - EN
42
Guide the retaining pins (1) into the bores 
in the mounting (2). Insert the cotter pin (3) 
into the retaining pin bores from above and 
allow to engage.
● Repeat this procedure on the other 
side.
Tensioning the V-belt (RT 5097, 
RT 5097 C, RT 5097 Z):
Pull the tension spring (1) forwards and 
attach to the mowing deck as shown.
Tensioning the V-belt (RT 5112 Z, 
RT 6112 C, RT 6112 ZL, RT 6127 ZL):
Press the V-belt tensioner lever (1) 
forwards and hold in place. Detach the 
retainer (2).
Tension the V-belt by relieving the load on 
the V-belt tensioner lever (1). Attach the 
retainer (2) to the V-belt tensioner lever (1) 
as shown.
Installing the V-belt cover:
Press the retaining plate (1) forwards and 
hold in place. Fold the V-belt cover (2) 
upwards. Guide the retaining plate (1) to 
the rear and engage at the two retaining 
tabs (3) on the V-belt cover.
Fasten the retaining plate in place using 
the screw (1).
● Install the discharge chute. (Ö 15.6)