EasyManua.ls Logo

Stuart Turner Mainboost MJ3 VM - Page 16

Stuart Turner Mainboost MJ3 VM
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 16 –
g) Ensure the floor is sufficiently strong enough to take the total weight of the
unit when full of water (see Technical Specification section). Take care when
manoeuvring the unit so as not to damage it.
NOTE: Do not forget if a water softener is to be installed this has to
be included in this pipe run, and additional space must be allocated
for this.
Do not fit smaller pipework than the upstream line-in kit accepts as
this will impair performance.
h) Fix the Mainsboost vessel securely to the floor using appropriately selected
and sized fixings.
Pump manifold assembly:
Vertical variant: Remove the pump manifold assembly from the packaging and
connect it to the pump assembly using the two fibre washers provided.
Fig. 14
Vertical
Fig. 15
Inlet
Manifold assembly
Outlet
Sealing
washers
Bypass valve and
integral NRV

Related product manuals