EasyManua.ls Logo

Stuart Turner MAINSBOOST VariQ - Installation Checklist and Preparation; Installation Checklist

Stuart Turner MAINSBOOST VariQ
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Cont ...
- 4
-
Please read installation details carefully as they are intended to ensure this product
provides long, trouble free service. Failure to install the unit in accordance with the
installation instructions will lead to invalidation of the warranty.
CHECKLIST
IMPORTANT: With the pump removed from its packaging check for any damage prior to
installation. If any damage is found contact Stuart Turner Ltd within 24 hours of receipt.
Fig 1.
Typical installation configuration.
Short 22mm coper pipe
tails to connect between
isolating valve and flexible
pipes.
22mm copper outlet
pipework (discharge).
22mm isolating valve (non-
restrictive) and fittings
(not supplied) to allow
easy pump service.
22mm flexible hose.
These hoses are fitted
with G¾ female connector
suitable for connection to
a G1m to G¾ adaptor or
fitting.
B
A
C
B
D
22mm copper inlet
pipework (suction)

Related product manuals