EasyManua.ls Logo

Stulz ASU series - Page 27

Stulz ASU series
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27 © STULZ GmbH – all rights reserved EN/06.2017/G18D
cyberair 3PrO cw2 Original instructiOns
Connection of the power supply cable
control line
power supply cable
 
 
neutral conductor at the neutral terminal and the three phases to the main switch, in accordance with the
wiring diagram (part of the unit documents).
 
Downflow units
Cabinet size 1 Cabinet sizes 2 - 7
Connection of control lines (optional)
If the A/C unit shall be connected to other Stulz units by the IO bus, to a BMS or contains opional extensions
as louvers, you must route control lines and connect them in the electric box of the A/C unit.

-
gram (part of the unit documents).

Related product manuals