Compact CWE Series Installation, Operation & Maintenance Manual
2-1
2.0 INSTALLATION
2.1 Receiving the Equipment
Your Compact CWE system has been tested and
inspected prior to shipment. To ensure that your
equipment has been received in excellent condition,
make a visual inspection of the equipment immediately
upon delivery. Carefully remove the shipping container
and all protective packaging. Open the access doors
and thoroughly inspect the unit interior for any signs of
transit-incurred damage. If there is shipping damage, it
must be noted on the freight carrier's delivery forms
BEFORE signing for the equipment. Any freight claims
MUST be done through the freight carrier. SATS ships
all equipment FOB. SATS can assist in the claim
filing process with the freight carrier. Should any such
damage be present, notify the SATS Product Support
Group prior to attempting any repairs. Refer to section
five of this manual for instructions.
A Data Package has been sent with your unit. It
contains this manual, a supplemental microprocessor
controller manual, system drawings, applicable
MSDS’s, other component manuals, warranty registra-
tion and other applicable instructions based on the
configuration and options of your unit. The data
package has been placed in your unit in a clear plastic
envelope. These documents need to be kept with the
unit for future reference.
NOTE
Items that have been shipped loose, such as
controllers, temperature/humidity sensors, wa-
ter detectors, etc., are shipped inside the air
conditioner unless specified otherwise by the cus-
tomer. The filter box or plenum box assembly (if
applicable) is shipped separately. Unpack and
store these items in a safe place unless you are
using them immediately.
40"
(MINIMUM FRONT
CLEARANCE)
Figure 1- Recommended Installation
Clearance
Front service access.