Section 3 Page
SPECIFICATIONS 30 Figure 3-3C Piping and Instrumentation- Water-cooled
(CONTINUED) 400-600HP/ 298-447KW (Typical)
Section 4
INSTALLATION
35 4.1 MOUNTING OF COMPRESSOR
35 4.2 VENTILATION AND COOLING
35 4.3 SERVICE AIR PIPING
35 4.4 COUPLING ALIGNMENT CHECK
35 4.5 FLUID LEVEL CHECK
36 4.6 FLUID PIPING (REMOTE AIR-COOLED OPTION ONLY)
37 4.7 ELECTRICAL PREPARATION
37 4.8 MOTOR ROTATION DIRECTION CHECK
Section 5
SUPERVISOR
CONTROLLER
31 5.1 SUPERVISOR CONTROL PANEL
Section 6
COMPRESSOR
OPERATION
39 6.1 INTRODUCTION
39 6.2 PURPOSE OF CONTROLS
40 6.3 INITIAL START-UP PROCEDURE
41 6.4 SUBSEQUENT START-UP PROCEDURE
41 6.5 SHUTDOWN PROCEDURE
Section 7
MAINTENANCE 43 7.1 GENERAL
43 7.2 DAILY OPERATION
43 7.3 MAINTENANCE AFTER INITIAL 50 HOURS
OF OPERATION
43 7.4 MAINTENANCE AFTER 1000 HOURS
43 7.5 FLUID CHANGE
43 7.6 SEPARATOR MAINTENANCE
43 7.7 PARTS REPLACEMENT AND ADJUSTMENT
PROCEDURES
43 MAIN FILTER MAINTENANCE
44 AIR FILTER MAINTENANCE
45 SEPARATOR ELEMENTS REPLACEMENT
46 OIL RETURN/SIGHT GLASS MAINTENANCE
46 DIFFERENTIAL PRESSURE REGULATOR
ADJUSTMENT
47 COMPRESSOR DRIVE COUPLING
TABLE OF CONTENTS