2.20
SECTION 2 - SPRAYER OPERATION
7. TEST CHEMICAL FILL
A. Add approximately 15 gallons of water to chemical ll tank.
B. Engage tractor hydraulic system or PTO system.
C. Set up Chemical Fill. When set up; close main supply valve halfway to draw chemical. THEN
OPEN FULLY TO KEEP FROM RUNNING PUMP DRY.
B. Engage tractor hydraulic system for the main tank pump and increase to normal eld rpm speed or
engage tractor PTO for the main tank pump and increase to normal PTO speed.
C. Immediately verify that agitator ow and main tank pump vent are going to front tank.
D. Disengage tractor hydraulic system or PTO system.
E. Close all valves.
6. CROSS SPRAYING – Main Tank Water to Front Tank Plumbing.
This allows the operator the ability to supply the boom normally used for the front tank with spray solu-
tion from the main tank.
A. Set up for Main Tank Water to Front
Tank Plumbing – Cross Spraying.
B. Engage tractor hydraulic system for the
front tank pump and increase to normal
eld rpm speed or engage tractor PTO
for the front tank pump and increase to
normal PTO speed.
C. Immediately verify that agitator ow
and front tank pump vent are going to
main tank.
D. Disengage tractor hydraulic system or
PTO system.
E. Close all valves.