EasyManua.ls Logo

Sungrow SBR128 - Page 33

Sungrow SBR128
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
When 4 or more than 4 battery modules are installed in one base, M5 screw set is
required to secure the switch gear. The stud is mounted on the top of battery
module.
step 9 Fix the battery to the wall.
The bracket is mounted on the top battery module.
The mounting position can be fine-tuned through oval holes in the back.
Goggles and gloves are necessary when drilling holes for protection. Shield the
battery during drilling. After drilling, clean up debris in time.
step 10 Connect the harness.
User Manual 4 Mounting

Related product manuals