Section II: Installation
200 SERIES SUB-FRAME CRITIICAL DIMENSIONS
LIFT BAR DETAIL
NOTE:
1. A STRUCTURAL JIB CONTACT POINT LOCATED AS LOW AS ALLOWABLE ON THE CONTAINER FRONT IS REQUIRED.
2. WELD HOOK GUARD TO BODY OR ADD STRUCTURAL SUPPORT AS NEEDED FOR THE APPLICATION.
3. THIS DRAWING PROVIDES THE CRITICAL SUB-FRAME DIMENSIONS FOR COMPATABILITY WITH THE SWAPLOADER
HOOK LIFT HOIST. IT IS THE SUB-FRAME SUPPLIER’S RESPONSIBILITY TO PROVIDE A SUB-FRAME OF SUFFICIENT
CAPACITY WHICH PROPERLY SUPPORTS THE BODY/CONTAINER WHEN USED WITH THE HOOK LIFT HOIST.
4. SWAPLOADER MANUFACTURED 200 SERIES A-FRAMES REQUIRE A 6 INCH LONGSILL HEIGHT.
200 SERIES SUB-FRAME DIMENSIONS
SL-2418HD 84 1/8” [2137 mm] 24” [610 mm]
SL-225 110 3/4” [2813 mm] 36” [915 mm]
SL-160/180/185/212/214/240 111 3/4" [2839 mm] 48” [1220 mm]
SL-205 122 3/4" [3118 mm] 36” [915 mm]
SL-220/222 123 3/4" [3143 mm] 48” [1220 mm]