Section II: Installation
EHV INSTALLATION (OPTIONAL)
1. Review all directions and diagrams provided
before starting the Electric over Hydraulic
Valve Installation
2. Mount the 22P58 EHV to the hoist’s Main
Frame and attach all hoses, hose clamp
assemblies and fittings as shown on Pgs. 6-5
through 6-7 (also see Illustrations).