EasyManua.ls Logo

TDW PIG-SIG V - Page 48

TDW PIG-SIG V
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
43
Section IV Pipeline Under Pressure
3.0 Continued
3.2 Checking Operation of Tapping Valve
A. Ensure the valve will open and close properly.
Operate and visually check that the valv
e
c
ompletely opens and closes (Figure 4.42)
.
D
epending on type of valve:
Ball Valves: ensure stops and indicators are
correctly set, or
Gate Valves: Count the number of turns requir
ed
t
o open and close the valve completely. Record
the number of turns on the Measurement Car
d
and m
easure the length of the stem above th
e
oper
ating handle in the open (Figure 4.43) an
d
c
losed position (Figure 4.44). Take note of thes
e
m
easurements.
Figure 4.42. Open and
Close Valve
Figure 4.43. Open
Position
Figure 4.44. Closed
Position
B. Leave the valve in the open position.
CAUTION
Do not use force when opening and
closing the valve. Use of force will
not improve the seal and can
damage the valve.