Section III – Pipeline Not Under Pressure
1.0 Installation
Overview and
Preparation
1.0 INSTALLATION OVERVIEW AND
PREPARATION
1.1 Initial Test
Figure 3.1. Verify PIG-SIG V
Operation
A. Before installation, assemble the flag indicator
assembly cap onto the plug assembly. Push the
cap downward until fully seated.
B. Install the three set screws and tighten to 1.5 ft.-
lb.
C. Set the flag and operate the trigger a couple of
times to ensure the unit functions correctly
(Figure 3.1).
D. After the test, remove the set screws and pull the
cap off the plug assembly.
NOTE:
The PIG-SIG V will be shipped partially assembled, as
shown in Figure 3.1.
Ensure hands and fingers are
clear of potential pinch points
around the flag when tripping or
resetting the unit.