EasyManua.ls Logo

Tech Controllers i-2

Tech Controllers i-2
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
Pictorial diagram – it cannot replace CH installation project. Its aim is to present how the controller may be expanded.
This heating installation diagram does not include protective elements which are necessary to ensure correct installation.
WARNING
In case of no flow in short circulation of CH boiler (incorrect installation), return sensor should be placed at CH boiler
hot water outlet in order to prevent the water from boiling.

Related product manuals