EasyManua.ls Logo

Technics SL-EH570

Technics SL-EH570
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
file:///C|/Documents%20and%20Settings/Administrator/Plocha/SL-EH570/s0500000000x.htm
5 Operation Checks and Component
Replacement/ Procedures
TOP PREVIOUS NEXT
This section describes procedures for checking the operation of the major printed circuit boards
and replacing the main components.
For reassembly after operation checks or replacement, reverse the respective procedures. Special
reassembly procedures are described only when required.
/
5.1 Checking for the main P.C.B.
5.2 Checking for the CD servo P.C.B.
5.3 Replacement for the traverse deck ass’y
5.4 Replacement for the belt, loading motor ass’y and loading switch
•@
TOP PREVIOUS NEXT
file:///C|/Documents%20and%20Settings/Administrator/Plocha/SL-EH570/s0500000000x.htm [25.4.2003 20:53:43]

Related product manuals