13
Cable Jungle
F
A
C C
F
E
Assembly
Once the weight stacks have been assembled insert their respective
crosspiece (E) above the weights; carefully insert guide rails (C) into their upper
housings (F); then tighten screws (A) to lock them in position.
Proceed in the same way for the other weight stack.
After completing the weight stacks on sides 2 and 4, assemble the cables (see the Assembling the pulleys and cables section).