EasyManua.ls Logo

Textron Bell 206L3 - Page 118

Textron Bell 206L3
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BHT-206L3-MM-1
5-00-00
Page 86 Rev. 16 25 FEB 2011
ECCN EAR99
7. Examine cabin entry steps for condition and security (if
installed).
8. Examine sealant joint at junction with skid tube saddles.
Restore sealant (C-251) and paint finish as required.
Chapter 32 SKID TUBES
1. Examine skid tubes for corrosion, damage, and security.
2. Examine skid shoes for condition and security.
3. Examine skid tube saddles for corrosion, damage, and
security.
4. Examine ground handling wheel attachment bolts for
condition and security.
GROUND RUN
CAUTION
GROUND RUN OF HELICOPTER TO BE
ACCOMPLISHED BY QUALIFIED PERSONNEL
ONLY.
Chapter 12 1. Make sure applicable servicing requirements have been
carried out.
2. Check oil level of transmission, hydraulic tank, engine and
rail rotor gearbox prior to running helicopter.
3. Make sure that helicopter is ready for ground run and that
surrounding area is clear.
BHT-206L3-FM-1
(BHT-206L4-FM-1 for
206L3+ IGW
Upgrade)
4. Start the helicopter and conduct ground run at 100% N
R
to
check for leaks and ensure all systems are operational and
parameters are within Flight Manual limitations.
PROGRESSIVE INSPECTIONS
5-26. 300-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 6 (CONT)
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER

Table of Contents

Related product manuals