EasyManua.ls Logo

Textron Bell 206L3 - Page 168

Textron Bell 206L3
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BHT-206L3-MM-1
5-00-00
Page 136 Rev. 16 25 FEB 2011
ECCN EAR99
6. Insert a mirror between the spiral bevel gear edge and the
lower case and use a bright light to examine the spiral bevel
gear, input pinion gears, and surrounding areas for condition.
7. Reassemble the transmission.
Chapter 63 8. Install the mast and swashplate assembly into the
transmission assembly.
9. Apply sealant, primer, and paint to the required areas.
10. Install the transmission assembly into the helicopter.
Chapter 12 11. Service the transmission with oil (DOD-PRF-85734).
SCHEDULED INSPECTIONS
5-44. 2250 HOURS OR 60 MONTHS OF COMPONENT OPERATION (CONT)
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER

Table of Contents

Related product manuals