BHT-206L3-MM-1
5-00-00
Page 152 Rev. 16 25 FEB 2011
ECCN EAR99
If a nut is improperly torqued, remove and check tare
torque, and replace as required. Recheck torque at
next 100 hours.
2. Check transmission top case stud nuts for torque.
a. For transmission (206-040-004-101/-111) 100 to
140 inch-pounds (12 to 15 Nm).
b. For transmission (206-040-004-107/-115) 130 to
160 inch-pounds (15 to 18 Nm).
BHT-ALL-SPM 3. Touch up paint finish as required.
5-51. 100 HOURS AFTER EACH INSTALLATION (CONT)
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER