EasyManua.ls Logo

Textron Bell 206L3 - Page 67

Textron Bell 206L3
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BHT-206L3-MM-1
5-00-00
25 FEB 2011 Rev. 16 Page 35
ECCN EAR99
c. lnspect entire tailboom for cracks, dents, deformation,
working rivets, and chafing between tailboom skin and fairing.
Pay particular attention to rivets attaching the tail rotor gearbox
support to the tailboom.
BHT-206-SRM d. Replace any loose or working rivets found.
e. Inspect all clip edges for integrity of sealant. Reseal as
required.
f. As applicable to tailbooms modified in accordance with
ASB 206L-99-115, examine doubler around stabilizer on left
side for integrity of sealant. Reseal as required.
3. Examine horizontal stabilizer for condition and security of
attachment. Verify security of all attachment bolts.
4. Examine elevators for condition, security of attachment,
and side play.
5. Examine auxiliary finlets for condition and security.
6. Inspect the vertical fin attachment support for condition and
damage. Pay particular attention to the vertical fin attachment
points.
7. Examine vertical fin assembly for condition and security.
Chapter 32 8. Examine vertical fin and tail skid for condition, security, and
signs of ground contact.
9. Examine for open tailboom drains on lower skin and clear
any obstructions.
10. Examine antennas for damage and security.
TAIL ROTOR DRIVESHAFTS
Chapter 65 1. Examine tail rotor driveshaft hanger bearings for excessive
grease leakage and evidence of overheating.
2. Examine segmented driveshafts and aft splined adapter for
condition and security. Check aft splined adapter for adequate
lubrication and freedom of movement.
PROGRESSIVE INSPECTIONS
5-18. 100-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 3 (CONT)
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER

Table of Contents

Related product manuals