EasyManua.ls Logo

Textron Cessna Skyhawk SP - Starting Engine (with External Power)

Textron Cessna Skyhawk SP
322 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CESSNA SECTION 4
MODEL 172S NAV III NORMAL PROCEDURES
GFC 700 AFCS
U.S.
STARTING ENGINE (With Battery) (Continued)
17. Oil Pressure - CHECK (verify that oil pressure increases into the
GREEN BAND range in 30 to 60 seconds)
18. AMPS (M BATT and BATT S) - CHECK (verify charge shown
(positive))
19. LOW VOLTS Annunciator - CHECK (verify annunciator is not
shown)
20. NAV Light Switch - ON as required
21. AVIONICS Switch (BUS 1 and BUS 2) - ON
STARTING ENGINE (With External Power)
1. Throttle Control - OPEN 1/4 INCH
2. Mixture Control - IDLE CUTOFF (pull full out)
3. STBY BATT Switch:
a. TEST - (hold for 10 seconds, verify green TEST lamp does
not go off)
b. ARM - (verify that PFD comes on)
4. Engine Indication System - CHECK PARAMETERS (verify no
red X's through ENGINE page indicators)
5. BUS E Volts - CHECK (verify 24 VOLTS minimum shown)
6. M BUS Volts - CHECK (verify 1.5 VOLTS or less shown)
7. BATT S Amps - CHECK (verify discharge shown (negative))
8. STBY BATT Annunciator - CHECK (verify annunciator is shown)
9. AVIONICS Switch (BUS 1 and BUS 2) - OFF
10. MASTER Switch (ALT and BAT) - OFF
11. Propeller Area - CLEAR (verify that all people and equipment
are at a safe distance from the propeller)
12. External Power - CONNECT (to ground power receptacle)
13. MASTER Switch (ALT and BAT) - ON
14. BEACON Light Switch - ON
15. M BUS VOLTS - CHECK (verify that approximately 28 VOLTS is
shown)
NOTE
If engine is warm, omit priming procedure steps 16 thru 18.
16. FUEL PUMP Switch - ON
(Continued Next Page)
172SPHBUS-02
4-13

Table of Contents