Do you have a question about the Titan Logix FINCH II and is the answer not in the manual?
power | 8-30 VDC |
---|---|
current consumption | 300mA at 12V |
fuse ratings | 5A (HORN, LIGHT, PUMP/AUX and ENGINE/AUX), 10A (RELAY MAIN) |
relay ratings | 3.3A Max on any individual relay, 6.6A Max across all 4 relays |
ambient temperature range | 40°C to +65°C |
---|---|
humidity | RH 95% max |
altitude | 2000 m |
communications | RS-232, TD100 SVBus |
---|
Details the scope and purpose of the manual.
States that information is subject to change without notice.
Provides a brief overview of the FINCH II system.
Outlines guidelines and codes to follow before installation.
Lists the sequence of steps for installing the Titan system.
Details the procedures for installing the Titan system components.
Provides instructions for the electrical wiring of the FINCH II.
Guides the installation for FINCH II-W with one or two compartments.
Details the installation process for the FINCH II-6W with multiple compartments.
Explains wiring for FINCH II display and high-level shutdown.
Covers installation for crude oil trailers with specific controls.
Describes procedures for testing and calibrating the installed system.
Configuration for failsafe operation, important for system safety.
Lists the types of alarms generated by the TD100 transmitter and FINCH II.
Details the four independently controlled relays within the FINCH II.
Describes the system startup sequence and initial tests.
Overview of how the TD100 measures levels and communicates with the FINCH display.
Explains the controls and display elements of the FINCH II.
Details the procedure for measuring and programming offset for accuracy.
Describes the different operating modes of the FINCH display.
Explains the various alarm states and their triggers.
Diagrams and explanations of alarm level settings based on probe type.
General advice and techniques for troubleshooting system issues.
Troubleshooting focused on the TD100 transmitter and its system.
An alternative method for troubleshooting TD100 system problems.
Procedures to test the operation of FINCH II relays and associated accessories.
A checklist for verifying the TD100 system after installation or repair.
Visual explanation of dual rod probe installation.
Visual explanation of coaxial probe installation.
General instructions on wiring the FINCH II system.
Identifies and describes the function of each terminal block on the FINCH II.
Recommended connections for FINCH II relays to external devices.
Defines how relays respond to different alarm conditions.
Details the SVBus connections for TD100 and RCM communication.
Explains the function of remote input terminals.
Describes the RS232 ports for communication and updates.
Specifies the maximum current ratings for the FINCH II relays.
Information on configuring hardware settings via DIP switches.