TD80 Level Gauging and Overfill Prevention System Product Manual
Rev. 2, August 4, 2015/ TD80 Introduction Page 13
TPM 001
5. Sequence of Events with Finch Relay Module installed
Table 1-1: Sequence of Events with Finch Relay Module installed
Event Sequence
Finch
Display
Red Light,
Horn
Green Light
Solenoid
Truck started, PTO NOT
engaged
“OFF”
Pulsed, then
OFF
OFF
OFF
PTO engaged
2 LO or
Level
OFF
ON
ON
Liquid loaded to Fill level
Flashing
Level
ON
ON
ON
Operator presses UP or DOWN
button
Level
OFF
ON
ON
Liquid loaded to HH alarm level
“HH”/Level
OFF
OFF
OFF
Operator presses
UP/UP/DOWN/UP
Level
OFF
ON
ON
Liquid loaded to Spill level
“SPILL”
OFF
OFF
OFF
PTO is disengaged. Operator
drives to next site.
“OFF”
OFF
OFF
OFF
Operator pumps out liquid with
PTO engaged.
Level
OFF
ON
ON
All liquid is pumped out
2 LO
OFF
ON
ON
PTO is disengaged. Operator
drives to next site
“OFF”
OFF
OFF
OFF

Table of Contents

Other manuals for Titan Logix TD80

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Titan Logix TD80 and is the answer not in the manual?

Titan Logix TD80 Specifications

General IconGeneral
BrandTitan Logix
ModelTD80
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals