EasyManua.ls Logo

TOHATSU BFT 80A - Operation; Break-In Procedure

TOHATSU BFT 80A
180 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
95
8. OPERATION
Break-in Procedure
Break-in period: 10 hours
Break-in operation allows the mating
surfaces of the moving parts to wear
evenly and thus ensures proper
performance and longer outboard
motor life.
Break-in your new outboard motor as
follows.
First 15 minutes:
Run the outboard motor at trolling
speed. Use the minimum amount of
throttle opening necessary to
operate the boat at a safe trolling
speed.
Next 45 minutes:
Run the outboard motor up to a
maximum of 2,000 to 3,000 min
-1
(rpm) or 10% to 30% throttle
opening.
Next 60 minutes:
Run the outboard motor up to
maximum of 4,000 to 5,000 min
-1
(rpm) or 50% to 80% throttle
opening. Short bursts of full
throttle are acceptable but do not
operate the outboard motor
continuously at full throttle.
Next 8 hours:
Avoid continuous full throttle
operation (100% throttle opening).
Do not run the outboard motor at
full throttle for more than 5
minutes at a time.
For boats that plane easily, bring the
boat up on plane then reduce the
throttle opening to the specified
break-in settings called out above.
36ZZ0T030_EN.book Page 95 Tuesday, November 28, 2017 4:19 PM

Table of Contents

Related product manuals