Manual of instructions TT-390 14/35
5. Installation
Before starting the unit the electrical and hydraulic connections have to be installed. The installation of
the unit has to be done in the order of the following chapters. After the proper installation the unit is
ready to use.
The temperature control unit must only be operated with heat transfer oil. Do
not use solvents or other explosive substance such as petrol, toluene, etc. in
the heat transfer oil circuit.
When starting the unit without the prescribed connections the unit can be
damaged.
Water quality (cooling circuit) – do not use water with chlorine addition.
Observe the General Safety Information!
Before installing corresponding chapter of the manual should be read!
5.1. Installing and dimensions of the temperature control unit