3
Installation
Loose
Parts
Note: Use the chart below to identify parts used for assembly.
DESCRIPTION QTY. USE
Discharge chute
Nylon washer 3/8”
Spring
Rubber bushing
Flat washer 1/2”
Lock nut 3/8”
Cotter pin 3/4”
1
2
1
1
1
1
1
Install discharge chute
PT
O drive belt
1
Install PT
O drive belt
Pulley box
1
Install pulley box
Operator’
s Manual
1
Read before operating
Mower
Preparation
Install the Discharge Chute
1. Locate the items shown (Fig. 1).
2. Place the short end of the spring into the small
hole in the discharge chute.
3. Position the spring and discharge chute over the
post on the rear of the deck and secure them with
a 1/2” (13 mm) washer and a 3/4” (19 mm)
cotter pin (Fig. 1).
4. Make sure the loop in the spring slides over the
stud on the mower housing.
5. Slide the rubber bushing and nylon washer over
the stud at the front of the mower.
6. Place the discharge chute over the stud and
secure it with a second nylon washer and 3/8”
lock nut (Fig. 1). The lock nut must be
tightened flush with the end of the stud.
IMPORTANT: The discharge chute must be
spring loaded in the down position. Lift the
chute up to test that it snaps to the full down
position.
1
3
2
5
4
6
7
8
10
9
Figure 1
1. Discharge
chute
2. Spring
3.
Cotter pin 3/4” (19 mm)
4. W
asher 1/2” (13 mm)
5.
Rubber bushing
6.
Plastic washer
7.
Jam nut 3/8”
8.
Loop in spring
9.
Post on mower housing
10.
Stud on mower housing