SETUP INSTRUCTIONS
27. Attach the Boom Feeder Hoses to the barbs
in the Boom Control Valves with hose clamps.
28. Place a hose clamp on the center Boom
Feeder H
Ose and attach it to the 90° Hose Barb
at the RH end of Center Boom Pipe.
29. Place a hose clamp on the right and left
Boom Feeder Hose and attach them to the
Double Barb Nozzles on the right and left Boom
Pipes.
NOTE: If installing the optional "Foam Marker
Kit", refer to the instructions furnished with
that kit for remaining set-up procedures.
24. Attach other end of Boom Bypass Hose
(installed in Step 1) into right end of Control Valve.
Secure with small square Fork.
23. Connect the plugs on the wiring harness to
the mating plugs from the Control Valve. Connect
the 3-Pin Connector on the Wiring Harness to
the 3-Pin Connector from the Flowmeter.
1. Valve Mounting Bar
2. Tie Straps
3. Wiring Harness
FIG. 9
4. 3-Pin Connector
5. Flowmeter
6. Control Valve
2
1
3
4
5
6
1816
25. Remove Plug from Pressure Tee on right of
machine and install Pressure Supply Hose.
Secure with U-Shaped Fork. Attach other end
of Hose to Tee at left of Control Valve. Secure
with Hose Clamp. (See FIG. 10 & 11)
26. Attach Agitation Hose to Control Valve By-
pass and secure with large square Fork. Attach
other end of Hose to bottom of Agitation Control
Valve, hand tighten nut. (See FIG. 10 & 11)
NOTE: If installing the "Enclosed Boom" option
in place of the Standard Boom, skip Steps 27-
29. See Enclosed Boom instructions.
1. Pressure Tee
2. Pressure Supply Hose
3. U-Shaped Fork
FIG. 10
4. Agitation Hose
5. Agitation Valve
3
1
4
2
1898
5
1. Control Valve
2. Hose Clamp
FIG. 11
3. Control Valve
By-pass
3
1
2
1899