EasyManuals Logo

Toro SGR-13 Operator's Manual

Toro SGR-13
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
InstallingtheSparkPlug
g028109
Figure22
FuelSystem
Maintenance
CleaningtheSedimentCup
ServiceInterval:Every100hours
Yearlyorbeforestorage
Underneaththefuelvalveisasedimentcuptocatch
dirtinthefuel.
1.Parkthemachineonalevelsurfaceandengage
theparkingbrake.
2.Shutofftheengineandwaitforallmovingparts
tostop.
3.MovethefuelvalvetotheOFFposition,allthe
waytotheleft.
4.Unscrewthesedimentcup(Figure23).
g241891
Figure23
1.Sedimentcup2.O-ring
5.CleanthereservoirandtheO-ringusinga
cleaningsolventanddrycarefully.
Note:MakesurenottomisplacetheO-ring.
6.PlacetheO-ringinthegrooveofthecupand
replacethesedimentcup.
7.TurnthefuelvalvetotheONposition,alltheway
totheright,andcheckforleaks.
Note:Ifitleaks,replacetheO-ring.
18

Other manuals for Toro SGR-13

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Toro SGR-13 and is the answer not in the manual?

Toro SGR-13 Specifications

General IconGeneral
Cutting HeightAdjustable
Number of Teeth12
Grind Speed3600 RPM
Fuel TypeGasoline
EngineHonda

Related product manuals