6-13
Digital Edition - TIMECUTTER® HD Service Manual
April 2017
Table of Contents
ENGINE
Engine
Kawasaki Engine (Cont.)
Installation (Cont.)
15. Connect the red wire to the starter (Figure 14).
16. Connect the chassis wire harness to the main engine wire harness.
17. Connect the fuel supply line to the fuel pump.
18. Connect vent line to barb/splice.
19. Install the hydrostatic drive belt, see “Hydrostatic Drive Belt Installation,” chapter 7, page 7-11.
20. Install the mower belt, see “Mower Belt Replacement,” chapter 3, page 3-15.
21. Install the mufer and new exhaust gaskets.
NOTE: Torque mufer mounting bolts or nuts to 150-170 in-lbs. (17-20 Nm).
22. Install the engine guard.
23. Fill crankcase with approved oil and verify proper oil level.
24. Connect the battery terminals.
25. Lower the unit and verify proper function.
NOTE: Verify Engine speed is set to proper RPM specication for the applicable model (Link to Specs
Chart).
Figure 14