EasyManua.ls Logo

Toro Z Master Professional 3000 Series - Mower Deck Maintenance and Leveling; Deck Setup and Leveling Procedures

Toro Z Master Professional 3000 Series
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.Installthereplacementhydrauliclter.
8.Installthepump-drivebeltandthemowerbelt.
9.Removethejackstandsandlowerthemachine
(Figure87).
10.Addoiltothehydraulicreservoirandcheckfor
anyleaks.
11.Cleanupanyspilledoil.
12.Starttheengineandletitrunforabout2minutes
topurgeairfromthesystem.
13.Shutofftheengineandcheckforleaks.
14.Checktheoillevelwhiletheoiliscold.
15.Ifrequired,addoiltothehydraulicreservoir.
Note:Donotoverll.
MowerDeck
Maintenance
LevelingtheMowerDeck
SettinguptheMachine
Note:Ensurethatthemowerdeckislevelbefore
matchingtheheightofcut(HOC).
1.Positionthemoweronaatsurface.
2.Disengagetheblade-controlswitch(PTO),move
themotion-controlleverstotheNEUTRAL-LOCK
position,andengagetheparkingbrake.
3.Shutofftheengine,removethekey,andwait
forallmovingpartstostopbeforeleavingthe
operatingposition.
4.Checktirepressureofthedrivetires.
5.Ifneeded,adjustto90kPa(13psi).
6.Positionthemowertothe76mm(3inches)
height-of-cutposition.
LevelingtheDeck
1.Positionthemoweronaatsurface.
2.Shutofftheengine,waitforallmovingpartsto
stop,removethekey,andengageparkingbrake.
3.Checkthetirepressureinthedrivetiresand
adjustifnecessary.
Note:Properinationpressurefortiresis90
kPa(13psi).
4.Positionthetransportlockinthelatching
position.
5.Pushthedeck-liftpedalallthewayforwardand
thedeckwilllatchatthe14cm(5–1/2inch)
TRANSPORTposition(Figure89).
59

Table of Contents

Related product manuals