– 85 –
2way valve coil
No. Part to be replaced Work procedure Remarks
1. Detachment
1) Carry out the detachment of item
1
(Front panel).
2) Remove connector which is connected from the control
P.C.board to the other part and then remove wiring from
the clamp.
CN033 ... (LM) 2way valve Green 3P
3) Remove the screw for the 2way valve coil.(M5x6.5, 1pc.)
2. Attachment
1) Carry out installation by following the detachment
procedure in reverse.
NOTE:
• Control the tightening torque for the 2way valve coil to
2.0 ± 0.5N•m.
• Be careful in the insertion direction of attaching the
2way valve coil, as shown below.
• Let 2 way valve coil wiring pass through the letf side
clamps.
Refer to item
3
(Electrical control box).
10
PMV motor
1. Detachment
1) Carry out the detachment of item
1
(Front panel).
2) Remove connector which is connected from the control
P.C.board to the other part and then remove wiring from
the clamp.
CN082.....PMV BLU E6P
3) While holding the PMV body so that it does not rotate,
rotate the PMV coil slightly and remove it in the
direction of the arrow.
2. Attachment
1) Carry out installation by following the detachment
procedure in reverse. Reinstall the PMV coil. Make sure
it does not move.
NOTE
• Be careful of the direction of the PMV coil.
• Check that four projections of the fixed claw of PMV coil
and PMV body have fitted in.
• Of lead wires and cable tiesPlease note the position.
• Let PMV wiring pass through the left side clamps.
Refer to item3 (Electrical control box).
11
Base and legs
1. Detachment
1) Carry out the detachment of item
8
(Drain pan).
2) Remove the screws for the legs.(5x10, 8pcs.)
9
2. Attachment
1) Carry out installation by following the detachment
procedure in reverse.
Base
Leg
Base
Leg
Spanner
2way valve coil
2way valve
coil drection
2way valve
coil drection
PMV coil
PMV coil
PMV body
PMV body