EasyManua.ls Logo

Totem 10 - Connection Panel Details

Totem 10
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The Electrical Board and Air intake compartment can be opened with a special key
solely by authorized personnel.
H.
Connection
All process connec
side,
opposite to the Control Switchb
The c
onnection
In
a standard configuration, process connections must fulfill the following
requirements:
A
: Fumes discharge
B:
Fuel gas supply (natural gas
C:
User water outlet
D: User water inlet
E: Condensate drain
A
B
C
D
E
User’s Guide | TOTEM 10
F: Control switchboard lock
G: Air intake compartment
H: Power cable entry
The Electrical Board and Air intake compartment can be opened with a special key
solely by authorized personnel.
Connection
Panel
All process connec
tions are located on one of the vertical members of the units back
opposite to the Control Switchb
oard.
onnection
s’ position is shown in figure.
a standard configuration, process connections must fulfill the following
requirements:
Fumes discharge :2” GTAS female
Natural gas connection: ¾” GAS female
User Water outlet: 1” ¼ GAS female
User Water inlet : 1” ¼ GAS female
Condensate Drain: ¾” GAS female
: Fumes discharge
Fuel gas supply (natural gas
)
User water outlet
D: User water inlet
E: Condensate drain
A
B
C
D
E
Users Guide | TOTEM 10
- TOTEM 20
19 of 30
The Electrical Board and Air intake compartment can be opened with a special key
tions are located on one of the vertical members of the unit’s back
a standard configuration, process connections must fulfill the following