EasyManua.ls Logo

Touchstone Sideline Series - Unpacking Your Fireplace; Unpacking and Setup Instructions

Touchstone Sideline Series
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Parts and Hardware
Tools Required
• Phillips screwdriver
• Stud finder
• Level
Unpacking and Setup
Unpacking Instructions:
• Remove all parts and hardware from the carton and place them on a clean, soft, dry surface. Check the
parts list to make sure no parts are missing. If parts are missing, please contact technical support at
800-215-1990 for replacement.
NOTE
:
Dispose of plastic bag, as it may cause choking hazard with young children.
Do not let children play with plastic bag.
* Delivered installed
Fireplace - 1
Wood Screws - 6 Drywall Anchors - 6
(Wall mount install use)
Metal Bracket - 2
Plastic Tray* - 1
Remote Control - 1
Crystal Embers - 1 BagFire Log - 1
Wall Bracket* - 1
(Wall mount install use)
Whats in the Box
• Tape measure
• Electric drill
• 1/4” wood drill bit
15
800.215.1990 touchstonehomeproducts.com
Unpacking Your Fireplace
Unpacking Your Fireplace