EasyManuals Logo

TP-Link JetStream L2+ User Manual

TP-Link JetStream L2+
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
JetStream L2/L2+ Managed Switch
17Connection
3.5 Power On
Plug the female connector of the provided power cord into the power socket of the device and plug
the positive connector into a power outlet as the following figure shows. Make sure that the voltage
of the power supply meets the requirement of the input voltage (100-240 V~ 50/60 Hz).
Figure 3-5 Connecting to Power Supply
Note:
The gure is to illustrate the application and principle. The provided plug and the socket in your
region may dier from the gures above.
3.6 Initialization
After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically
to ensure the device functions properly. During this time, its LED indicators will respond in the
following order:
1. The PWR LED indicator lights on all the time. The SYS LED and the LED indicators of all the ports
keep off.
2. After about one minute, the SYS LED and LED indicators of all the ports will flash momentarily and
then turn off.
3. Several seconds later, the SYS LED indicator will flash, which represents a successful initialization.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TP-Link JetStream L2+ and is the answer not in the manual?

TP-Link JetStream L2+ Specifications

General IconGeneral
BrandTP-Link
ModelJetStream L2+
CategorySwitch
LanguageEnglish

Related product manuals