EasyManua.ls Logo

Trane 4TYK6524D1000AL - Installation of TXV Valve

Trane 4TYK6524D1000AL
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MS-SVN052E-EN 15
Unit Installation
Installation of TXV Valve
TXV Kit (thermostatic expansion valve) provided together with the equipment is for on-site
mounting. Installation of this valve must be done with tapered threaded fitting.
Figure 10. Thermostatic Expansion Valve TXV
Figure 11. Steps for TXV Kit Installation
Step 1 - Remove the fixed expansion device (calibrated orifice) mounted on the indoor unit. See
images.
Step 2 - Connect liquid line and gas line piping to the outdoor unit (brazed fitting).
Step 3 - Connect the thermostatic expansion valve TXV to the liquid line and gas line connections
coming from the outdoor unit.
Step 4 - Connect the thermostatic expansion valve TXV to the liquid line and gas line piping of the
indoor unit. Apply appropriate torque. Verify the absence of refrigerant leaks.
TXV KIT
Brazed
ĐŽŶŶĞĐƟŽŶ
Tapered
ĐŽŶŶĞĐƟŽŶ
TX
SETP 1
STEP 2
STEP 4
V
KIT
X
V
STEP 3

Table of Contents

Related product manuals