Installation Instructions
1. UUnnppaacckkiinngg
Carefully unpack the unit and inspect the contents
for damage. If any damage is found at the time of
delivery, proper notification and claims should be
made with the carrier.
Check the rating plate to assure model number and
voltage, plus any kits match with what you ordered.
The manufacturer should be notified within 5 days
of any discrepancy or parts shortage.
2. LLooccaattiioonn
The air handler should be centrally located and may
be installed in a closet, alcove, utility room,
basement, crawl space or attic. Minimum
clearances must be met.
IImmppoorrttaanntt:: The downflow sub-base may be
required with electric heat applications.
See minimum clearance table.
Equipment shall be installed in such a way which
reduces the likelihood of ignition of leaked
refrigerant.
WWAARRNNIINNGG
RRiisskk ooff FFiirree!!
TThhee ffoolllloowwiinngg rreeqquuiirreemmeennttss aappppllyy ttoo tthhee rroooomm
wwhheerree tthhee aaiirr hhaannddlleerr iiss iinnssttaalllleedd::
•• AAllll ccoommbbuussttiioonn aapppplliiaanncceess llooccaatteedd iinn tthhee ssaammee
rroooomm tthhaatt hhaavvee ccoonnttiinnuuoouuss ppiilloott lliigghhttss aarree
eeqquuiippppeedd wwiitthh aann eeffffeeccttiivvee ffllaammee aarrrreesstt..
•• AAllll iinnddoooorr ffiieelldd--mmaaddee jjooiinnttss ooff tthhee ffiieelldd ppiippiinngg
hhaavvee bbeeeenn cchheecckkeedd ffoorr rreeffrriiggeerraanntt lleeaakkss aafftteerr
cchhaarrggiinngg uussiinngg aann eelleeccttrroonniicc lleeaakk ddeetteeccttoorr
ccaalliibbrraatteedd ffoorr RR--445544BB hhaavviinngg aa sseennssiittiivviittyy ooff 55
ggrraammss ppeerr yyeeaarr oorr bbeetttteerr..
•• TThhee rroooomm iiss ccoonnssttrruucctteedd ttoo eennssuurree tthhaatt sshhoouulldd
aannyy rreeffrriiggeerraanntt lleeaakk iitt wwiillll nnoott ssttaaggnnaattee aanndd ccrreeaattee
aa ffiirree hhaazzaarrdd..
The unit should be installed in a level position to
ensure proper condensation drainage. Up to an
additional 1/4” rise over the width or depth of the
unit is allowed to create additional sloping towards
the drain. Unit must be positioned between level
and ¼” rise, sloping toward the drain connections.
When the unit is installed in a closet or utility room,
the room should be large enough, and have an
opening to allow replacement of the unit. All
servicing is done from the front and a clearance of
21" is needed for service unless the closet door
aligns with the front of the air handler.
If you are installing the unit in an unconditioned
space such as an attic or crawl space, you must
ensure that the area provides sufficient air
circulation to prevent moisture collection on the
cabinet during high dew point conditions. A drain
pan must be installed under the entire unit when it
is installed in or above a finished ceiling or in an
unconditioned space.
3. DDuucctt WWoorrkk
WWAARRNNIINNGG
RRiisskk ooff FFiirree!!
FFaaiilluurree ttoo ffoollllooww tthhiiss wwaarrnniinngg ccoouulldd rreessuulltt iinn
sseerriioouuss iinnjjuurryy,, ddeeaatthh,, oorr pprrooppeerrttyy ddaammaaggee..
AAuuxxiilliiaarryy ddeevviicceess wwhhiicchh mmaayy bbee aa ppootteennttiiaall
iiggnniittiioonn ssoouurrccee,, ssuucchh aass hhoott ssuurrffaacceess oorr eelleeccttrriicc
sswwiittcchhiinngg ddeevviicceess,, sshhaallll nnoott bbee iinnssttaalllleedd iinn tthhee
ccoonnnneeccttiinngg dduuccttwwoorrkk uunnlleessss tthheeyy hhaavvee bbeeeenn
aapppprroovveedd bbyy tthhee mmaannuuffaaccttuurreerr oorr ddeeccllaarreedd ssuuiittaabbllee
wwiitthh tthhee rreeffrriiggeerraanntt uusseedd..
The duct work should be installed in accordance
with the NFPA No. 90A "Installation of Air
Conditioning and Ventilating systems" and No. 90B
"Residential Type Warm Air Heating and Air
Conditioning Installation."
The duct work should be insulated in accordance
with the applicable requirements for the particular
installation as required by HUD, FHA, VA the
applicable building code, local utility or other
governing body.
4. CCoonnddeennssaattee DDrraaiinn
The unit is supplied with primary and auxiliary
condensate drains that have 3/4" NPT connections.
The primary drain must be trapped outside the unit
and piped in accordance with applicable building
codes.
The figure shows the operation of a properly
designed trap under normal operating conditions
when the blower is running and the condensate is
draining. Note the difference in height of the water
column must at least equal the normal negative
static pressure existing during operation between
the cooling coil and blower. It is advisable to have
the difference in water column height somewhat
greater than the normal maximum operating static
to allow for greater static caused by dirty filters or
for the bounce of the water column on start up.