RT-SVN037A-EN
3
WWAARRNNIINNGG
FFoollllooww EEHHSS PPoolliicciieess!!
FFaaiilluurree ttoo ffoollllooww iinnssttrruuccttiioonnss bbeellooww ccoouulldd rreessuulltt iinn
ddeeaatthh oorr sseerriioouuss iinnjjuurryy..
AAllll TTrraannee ppeerrssoonnnneell mmuusstt ffoollllooww tthhee
ccoommppaannyyss EEnnvviirroonnmmeennttaall,, HHeeaalltthh aanndd SSaaffeettyy
((EEHHSS)) ppoolliicciieess wwhheenn ppeerrffoorrmmiinngg wwoorrkk ssuucchh aass
hhoott wwoorrkk,, eelleeccttrriiccaall,, ffaallll pprrootteeccttiioonn,, lloocckkoouutt//
ttaaggoouutt,, rreeffrriiggeerraanntt hhaannddlliinngg,, eettcc.. WWhheerree llooccaall
rreegguullaattiioonnss aarree mmoorree ssttrriinnggeenntt tthhaann tthheessee
ppoolliicciieess,, tthhoossee rreegguullaattiioonnss ssuuppeerrsseeddee tthheessee
ppoolliicciieess..
NNoonn--TTrraannee ppeerrssoonnnneell sshhoouulldd aallwwaayyss ffoollllooww
llooccaall rreegguullaattiioonnss..
Copyright
This document and the information in it are the
property of Trane, and may not be used or reproduced
in whole or in part without written permission. Trane
reserves the right to revise this publication at any time,
and to make changes to its content without obligation
to notify any person of such revision or change.
Trademarks
All trademarks referenced in this document are the
trademarks of their respective owners.
Unit Inspection
To protect against loss due to damage incurred in
transit, perform inspection immediately upon receipt of
the unit.
Exterior Inspection
If the job site inspection reveals damage or material
shortages, file a claim with the carrier immediately.
Specify the type and extent of the damage on the bill of
lading before signing. Notify the appropriate sales
representative.
IImmppoorrttaanntt:: Do not proceed with installation of a
damaged unit without sales
representative’s approval.
Visually inspect the complete exterior for signs of
shipping damages to unit or packing material.
Verify that the nameplate data matches the sales
order and bill of lading.
Verify that the unit is properly equipped and there
are no material shortages.
Verify that the power supply complies with the unit
nameplate specifications.
Inspection for Concealed Damage
Visually inspect the components for concealed damage
as soon as possible after delivery and before it is
stored.
If concealed damage is discovered:
Notify the carrier’s terminal of the damage
immediately by phone and by mail.
Concealed damage must be reported within 15
days.
Request an immediate, joint inspection of the
damage with the carrier and consignee.
Stop unpacking the unit.
Do not remove damaged material from receiving
location.
Take photos of the damage, if possible.
The owner must provide reasonable evidence that
the damage did not occur after delivery.
Parts List
2 Side rails
2 End rails
1 Side curb flange
1 End curb flange
4 Insulated block-off panels
Gasketing material
Sheet metal screws