Trane CLCP Euro 50 User Manual

Trane CLCP Euro 50
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation
Operation
Maintenance
Quantum Climate Changer™ Air Handlers
Model : CLCP
Euro 25, CLCP Euro 50, CLCP Euro XP
Airflow Range : 1000 ~ 65,000 CFM (0.5 ~ 31 m³/s)
October 2018
IND-SVN01A-E4
Question and Answer IconNeed help?

Do you have a question about the Trane CLCP Euro 50 and is the answer not in the manual?

Trane CLCP Euro 50 Specifications

General IconGeneral
BrandTrane
ModelCLCP Euro 50
CategoryAir Handlers
LanguageEnglish

Summary

Introduction

Safety Advisories Overview

Defines different types of safety warnings: WARNING, CAUTION, NOTICE.

Field Wiring and Grounding Safety

Safety warning on electrical installation hazards.

Personal Protective Equipment (PPE) Requirements

Safety warning on mandatory PPE usage.

Environmental, Health, and Safety (EHS) Policies

Adherence to company EHS policies.

Receiving and Handling

Rigging and Handling Procedures

Safe methods for lifting and moving the unit.

Unit Placement and Assembly

Duct Connections

Standards and methods for air duct installation.

Assembly & Installation Details

Break Point Joining Method

Module joining procedure at job site.

CLCP EURO 25 Frame-to-Frame Joining

Specific assembly for frame connections.

CLCP EURO 25 Panel-to-Frame Joining

Specific assembly for panel connections.

CLCP EURO 50 Frame-to-Frame Joining

Specific assembly for frame connections.

CLCP EURO 50 Panel-to-Frame Joining

Specific assembly for panel connections.

CLCP EURO XP Internal Joint Type 1

Assembly for XP internal joints (Type 1).

CLCP EURO XP Internal Joint Type 2

Assembly for XP section joints (Type 2).

CLCP EURO XP Internal Joint Type 3

Assembly for XP section joints (Type 3).

CLCP EURO XP CKD Assembly Work

Sealing procedures for jobsite assembly.

Piping and Connection

Condensate Drain Pan Connection

Proper setup for condensate drainage.

Chilled Water Coil Piping

Connecting chilled water piping to coils.

Steam Coil Piping

Procedures for Type A/AA steam coil piping.

Refrigerant Coil Piping Practices

Guidelines for refrigerant line installation.

Start-Up Procedures

Initial Unit Checks

Essential checks before unit operation.

Maintenance Schedule

Periodic Maintenance Checklist

Suggested maintenance tasks and frequency.

Air Filter Maintenance

Cleaning or replacing air filters.

Drain Pan Inspection and Cleaning

Steps for maintaining drain pans.

Coil Cleaning Procedures

Methods for cleaning various types of coils.

Pulley and Belt Service

Maintenance for belt drives and pulleys.

Trouble Analysis

Pulley and Belt Troubleshooting

Appendices

Electrical Diagrams

Factory VFD Wiring and Settings

Diagrams and settings for TR200 VFD.

TR200 VFD Basic Settings

Open loop parameter configuration for VFD.

Pre-Start Up Checklist